------------------------------------------------------------ Date: Thu Oct 4 00:13:24 2001, Shift: 16:00-24:00 Supervisor: burt budick, with: none Log book#9 pages 85 - 86 Shift Summary: ------------------------------------------------------------ Beam was on for first 2.5 hours Run 5111 was completed with 22 sequences, trigger 1 278K. Several short runs were devoted to a study the efficiency of T5 as a function of discriminator threshold. When the beam was dumped at 6:30 pm, pedestal runs for all detectors including TPC's were taken, as well as a drift velocity monitor run. Same problem for slat 3 in H2 as noted in previous run. Problem communicating with mainframe for H1 and C1, although Supermon indicated both detectors functioning normally. ------------------------------------------------------------