------------------------------------------------------------ Date: Thu Jan 24 00:06:57 2002, Shift: 16:00-24:00 Supervisor: BHS, with: Log book#12 pages 111 - 114 Shift Summary: ------------------------------------------------------------ So - the final shift report, the final official brahms shift for this run! The last evening has been a good one - we got a beautiful store at 16:15 which has lasted all through the shift. The final program set by Flemming and Dana was easily completed. The one problem we had was with D1 - it did not like being run at full field (power overheated due to a problem with the cooling...) and so the poor mag-guys spent a total of 2.5 hrs playing with the thing. Breakdown of data runs: All have MRS@90, FS@3 degrees Run FS MRS Trig 3 Trig 4 Trig 6 6750 1A 6B 8k 7k 30k 6752 1A 6B 10k 8k 32k 6754 1/2A 6B 16k 77k 130k 6755 1/3A 12B 7k 114k 167k 6756 1/3B 12B 7k 163k 222k 6757 1/2B 12B 20k 272k 430k Runs with MRS only due to the D1 problems: 6751 off 6B 10k 9k 39k 6753 off 6B 49k 195k 382k Magnets are now on standby and all anodes have been turned off/parked, but all the rest of the stuff is left on in case anyone wants to do some work with the pp2pp-specific beam tomorrow. Yeeeeeha :-) ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Jan 24 2002 - 00:07:47 EST