Shift report 20020122 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Jan 22 2002 - 07:59:27 EST

  • Next message: Apache: "Shift report 20020122 08:00-16:00"

    ------------------------------------------------------------
    Date: Tue Jan 22 07:59:27 2002, Shift: 00:00-08:00
    Supervisor: hiro, with: 
    Log book#12 pages 104 - 104
    
    Shift Summary:
    ------------------------------------------------------------
    1.  Beam from 3:00
    2.  RUN6731 175K trig 3 finished MRS 35(deg) B Pol
        RUN6732 30k trig 3 finished MRS 35 deg  0 feild run
        RUN6733 265k trig 3 finished MRS 35 (deg) A pol 
        RUN6734 is still going. trig 3 is 60k MRS 45 deg B Pol
    
        For FS, 1/2 field at 12 deg  A Pol.
    
    3.  Right after starting RUN6732, I noticed D3 had been
        tripped.  I am not sure if it was tripped during
        RUN6731.
    
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Tue Jan 22 2002 - 08:01:27 EST