------------------------------------------------------------ Date: Fri Jan 18 08:18:55 2002, Shift: 00:00-08:00 Supervisor: JH Lee, with: Log book#12 pages 77 - 81 Shift Summary: ------------------------------------------------------------ 1. Physics Beam since 02:50 started at rates of - B/Y = 25/40*10^11 - In-el 18K/sec - 15 trigger3/sec 2. Data: - MRS at 90 6B - FS at 3 1/5B - run 6648: 47K trigger3 210K trigger6 in 100 min. (scale down trigger3:trigger6 = 1:5) run 6656: 60K trigger3 and still running 3. Problems: T2 readout problem: - Couldn't take data with T2 in DAQ after run 6648. - Recycling power of T2 readout board couldn't fix the problem. - Now running with only MRS (run 6656) - It needs to be investigated after the current store. D3 Trip and reset. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Jan 18 2002 - 08:19:25 EST