------------------------------------------------------------
Date: Sun Jan 13 00:10:38 2002, Shift: 16:00-24:00
Supervisor: hiro, with: 
Log book#12 pages 52 - 52
Shift Summary:
------------------------------------------------------------
1.  Beam for most of the shift.
  At the end of the shift, pol flipper study.
2.  Run 6432
      MRS 4k A at 45deg
      FS  1/3 B at 4deg
    Finished the settings.
    Since DAQ could not handle the events,
    the scale-down of trigger 6 was reduced 
    Run 6434
      MRS 3k A at 60 Deg
      FS 1/15 B at 20 Deg
3.  None detected.
  
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Mon Jan 14 2002 - 11:30:40 EST