>From the scheduling physicist. Notice the the web address mentioned does not work unless you are inside CA-D the public place is http://www.agsrhichome.bnl.gov/AP/RHIC2001/SchedPhys/ ------------------------------------------------------ Flemming Videbaek Physics Department Brookhaven National Laboratory tlf: 631-344-4106 fax 631-344-1334 e-mail: videbaek@bnl.gov ----- Original Message ----- From: Angelika Drees Sent: Friday, January 11, 2002 4:57 PM Subject: production, production, production ... Hi all, what a nice friday ;) - it finally stopped raining and the booster extraction problem could be fixed! The controlled accesses this morning was done long before the booster failure ended. Now we're back in business. We have beam in RHIC and *everybody* in the control room to work on chromaticity and the issue with emittance blow-up (from the polarimeter ?) at injection. As soon as possible we'll turn to production mode and hopefully keep colliding (protons ;)) for the rest of today and the weekend. Please have a look at my webpage: http://www.cadops.bnl.gov/AP/RHIC2001/SchedPhys/) for upcoming issues next week (including PHENIX photon converter, polarimeter calibration run and beam studies). We'll revisit these topics the latest next week after the time meeting. As usual, I'll keep you posted. Have a nice - and productive! - weekend, \|/ Angelika (.~.) o0(_)0o ----------------------------------------------------------- Angelika Drees (Collider-Accelerator Department, AP group) BNL, Building 911b-210 work: (631) 344 2348 FAX: (631) 344 5954 home: (631) 474 3884
This archive was generated by hypermail 2b30 : Mon Jan 14 2002 - 11:28:20 EST