------------------------------------------------------------ Date: Mon Jan 7 00:01:27 2002, Shift: 16:00-24:00 Supervisor: kh, with: Log book#12 pages 9 - 13 Shift Summary: ------------------------------------------------------------ A fairly productive shift. Had beam right at the beginning of the shift and started a 0 field run. Shortly thereafter MCR called and asked if we wanted to keep the beam as it was not polarized. I said keep it. They called 5 minutes later saying they would dump because 4 out of the other 5 experiments wanted to dump. Came back about 18:00 and that has lasted until shift end. Achievements: Runs trig 3 trig 6 FS MRS effective effective 6315 34908 12512 12 deg 0 field (D1=0) 35 4A 6316 68881 22835 12 deg 0 field (D1=1/8) 35 4A 6317 73264 23816 12 deg 1/8 field 35 4A 6318 180525 63713 12 deg 1/8 field 40 4A Run 6318 still running at shift end. Numbers indicate statistics at shift end. The run goal for MRS at 35 deg setting 4A was achieved with 462k events effective. I therefore moved the MRS to 40 as can be seen for run 6318 Problems: 1. T3 and T5 cathodes tripped. Cause is unknown. This was discovered quickly thanks to badtrip. 2. Lost connection to Ioserver. Regained by using instructions on "Share your Experience" It worked. 2. I noticed a water leak in the roof just above the D5 power supply. It had obviously been noticed before because there was black plastic guiding the water away from the power supply (more or less working) But the bottom by the pumps had a fair amount of water. Called MCR who sent support and they mopped it up and promised that someone would work on the roof tomorrow. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Mon Jan 07 2002 - 00:02:20 EST