Shift report 20020106 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sun Jan 06 2002 - 00:04:21 EST

  • Next message: Apache: "Shift report 20020106 00:00-08:00"

    ------------------------------------------------------------
    Date: Sun Jan  6 00:04:21 2002, Shift: 16:00-24:00
    Supervisor: KH, with: 
    Log book#12 pages 3 - 6
    
    Shift Summary:
    ------------------------------------------------------------
    No real beam until 22:20
    
    Had a 15 minute access which I used to try to resurrect
    the BFS inner camera.  I did not succeed.
    
    Just after beam was stored and cogged while going through
    the checklist for the first run after having beam, I
    discovered that D2 had tripped.  Called MCR.  They came
    and fixed the problem.
    
    One real run.
    6302     24k trigger 6 events at shift end.
    
    IMPORTANT NOTE CONCERNING TRIG 6 PROGRESS TOWARD RUN
    PLAN GOALS:
    
    Because we have less tracks per event with current timing, trigger 6 events for runs later than 6290 need to be 
    counted with less weight.  Therefore, in calculating how far we are towards a goal, we use the following until 
    further notice: (see logbook 12, page 4)
    
    Goal Trig 6(MRS) = Trig 6(MRS)(Total to run 6289) + Trig 6(MRS)/5
    Goal Trig 6(FS)  = Trig 6(FS) (Total to run 6289) + Trig 6(FS)/2
    
    Another way of looking at that is that the remaining 
    trig 6s after run 6289 need to be 5 (MRS) and 2(FS) 
    times the goal in the run plan.
    ------------------------------------------------------------
    