------------------------------------------------------------
Date: Sat Dec 29 08:42:29 2001, Shift: 00:00-08:00
Supervisor: hiro, with:
Log book#11 pages 111 - 111
Shift Summary:
------------------------------------------------------------
1. Beam is stored until 1:00
Beam is stored at 5:40.
(It is still going.)
2. Run 6190, 6192, 6193
3. None detected.
For silicon:
To test more about attenuation for
silicon, the 50 ohm resister (terminator) in
Si1_1c is removed(It is still back terminted.)
The attenuation is 1.5x (not quite 1x)
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Dec 29 2001 - 08:44:34 EST