Shift report 20011228 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Dec 28 2001 - 07:57:30 EST

  • Next message: Apache: "Shift report 20011228 08:00-16:00"

    ------------------------------------------------------------
    Date: Fri Dec 28 07:57:30 2001, Shift: 00:00-08:00
    Supervisor: hiro, with: 
    Log book#11 pages 104 - 104
    
    Shift Summary:
    ------------------------------------------------------------
    1.  beam stored from 4:30    At 6 am, Polarized source is broken, and needs repair
    until noon.  Until then, unpolized source will be used.
    2.  run6182.
        Since 1458B and fb3 are fixed, all detectors are on.
    
    3.  NONE detected.
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Fri Dec 28 2001 - 07:58:07 EST