[Fwd: weekend plans]

From: Flemming Videbaek (videbaek@sgs1.hirg.bnl.goV)
Date: Fri Dec 21 2001 - 19:38:26 EST

  • Next message: Apache: "Shift report 20011222 00:00-08:00"

    FYI in regard to pp running.
    
    - todays progress from our side.
      a) tunes Inel timing. Inelastic ratea are 1-2K. They ought to be ~
    20-40K at this years luminosity estimate. The machine
          has still ways to go.
      b) commisioned MRS trigger
           - the initial rejection is very good; effeciency has to be
    studied in more detail analysis data.
       c) We will take data with the two inel trigger (scaledoneed) and the
    MRS trigger.
      - starting looking at the FS trigger; With some good luck we can
    report progress tomorrow.
    
    regards
        Flemming
    
    
    
    

    attached mail follows:


    Hi all, we made it - don't get too excited, it's just the pp commissioning phase 1 ;). Since last night, once we set up the machine for collisions after the maintenance yesterday, we are in "production mode" (whatever it means :)). Today and thru the night we'll basically just refill and provide collisions to experiments (while applying minor changes to the ramps). Earlier this afternoon we moved the roman pots from the PP2PP experiment into the beam pipe (just a tiny little bit!) for the first time while a store was going on. No background, beam losses or any other disturbances could be observed :). Tomorrow during the day we'll spent some time on tune feedback and in general we'll continue to work on intensity/ramp improvements. In addition, we'll measure polarization in RHIC at injection and every 2 hours at store in every fill we keep. We will limit fills to approx. 4 h (i.e. 3 pol. measurements per fill) or to an intensity of > 1*10^12 per ring. Polarized Protons: recent measurements in RHIC resulted in about 25% at injection and about 20% in blue, <10% in yellow at store which was decreasing by another factor of 2 during the store of 8 h. We'll continue to work on polarization behind RHIC stores. Westinghouse: brushes wear in slowly, it is likely that another maintenance shutdown next week is NOT necessary. For the time being there are no access requests (short CONTROLLED accesses during the night are still possible!), the PHENIX access was successful :) and a long shutdown next week seems not to be required. However, we'll have a beam study period of 6 h on wed, Dec. 26, 8:00 -14:00. I'll keep you posted about any changes. Have a nice weekend (and successful, last minute, christmas shopping!), -- \|/ Angelika (.~.) o0(_)0o ----------------------------------------------------------- Angelika Drees (Collider-Accelerator Department, AP group) BNL, Building 911b-210 work: (631) 344 2348 FAX: (631) 344 5954 home: (631) 474 3884