------------------------------------------------------------ Date: Sun Nov 25 16:01:17 2001, Shift: 08:00-16:00 Supervisor: rw, with: fv,mm Log book#11 pages 33 - 38 Shift Summary: ------------------------------------------------------------ 1.22Gev beam was ready at 10:00. FV and MM worked for ZDC and trigger in the morning. Physics run started at 11:00. Beam stored and, after 10min., cogged (without energy ramping), waiting for being ready for voltage setup for all four experiments and lasted about 1h for data taking and dumped. In 10min. next beam was stored and cogged. This cycle was repeated beautifully without break. Hope to see this beautiful cycle for 100Gev next year. ZDC rate was about 15 in the beggining. 2. run trigger1 5992 10.7K TPM1,TPM2,T1,T2 ON FS 12deg-1/10A MRS 90deg-2A 5993 13.3K 5995 11.4K 5996 22K 3. no new detecotr problems ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sun Nov 25 2001 - 16:01:50 EST