------------------------------------------------------------ Date: Sat Nov 24 15:51:21 2001, Shift: 08:00-16:00 Supervisor: rw, with: Log book#11 pages 31 - 31 Shift Summary: ------------------------------------------------------------ 1. No beam for the entire shift. Booster problem from the previous shift was fixed at 9:30. At 10:30 AGS BTA magnet power supply problem was announced. No time estimate for beam. 2.run 5075, 5976,5977 are pedestal and DVM runs. 3. No detector problems. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Nov 24 2001 - 15:52:27 EST