------------------------------------------------------------
Date: Fri Nov 23 00:10:23 2001, Shift: 08:00-16:00
Supervisor: James Norris, with: 
Log book#11 pages 25 - 26
Shift Summary:
------------------------------------------------------------
1. At 16:00 previous beam stored & cogged 
      (at ~15:00 22-Nov-01)
   At 17:00 switched D1-D4 to polarity B for the 
            FS=8degree D1-D4 1/8B Run
   At 17:15 MCR announced 15min access at end of this run
   At 19:55 voted to dump
   At 19:55 MCR announced beam dump in 30-45min
   At 20:21 MCR called to warn of beam dump 15min
   At 20:50 beam was dumped
   At 21:40 MCR estimates beam in 30min
   At 22:15 MCR preparing to fill RHIC
   At 22:47 beam stored and cogged, ZDC rates:
      BRAHMS=550, STAR=1351, PHENIX=2598, PHOBOS=1578
                             trigger 6
2. Run 5947 - 15:50-16:57      102.3K
   Run 5947 completed the FS=8degree D1-D4 1/8A Goal
   Run 5948 - 17:21-20:30      105.8K
   Run 5952 - 22:55-23:23       55.6K
   Run 5952 completed the FS=8degree D1-D4 1/8B Goal
   Run 5953 - 23:29-           (70.1K)
3. Nada!
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Nov 23 2001 - 00:10:55 EST