------------------------------------------------------------
Date: Wed Nov 21 07:58:50 2001, Shift: 00:00-08:00
Supervisor: james norris, with: 
Log book#11 pages 19 - 20
Shift Summary:
------------------------------------------------------------
1. At 00:00 previous beam stored & cogged 
      (at ~22:00 20-Nov-01)
   At 02:14 voted to dump ZDC=281<(1/3)*1200
   At 02:40 gap cleaning in blue ring
   At 02:53 MCR called to warn of beam dump
   At 02:57 quench link interlock
   At 03:54 ramping for hysteresis
   At 04:13 preparing for injection
   At 04:32 filling, preparing to ramp
   At 05:20 quench link interlock
   At 06:39 ramping for hysteresis
   At 07:02 preparing for injection
   At 07:48 quench link interlock
   
                             trigger 6
2. Run 5915 - 22:35-00:20       200K
   Run 5916 - 00:24-00:53     107.2K
   Run 5917 - 02:39-02:53       7.4K
3. Noticed in brntuple plots for runs
   5910 - signal suppression in low channels
          for h5, h6, h13, h14, h16 of 
          ZDC page
   5914 - single count blips in high channels
          for all plots of
          TPC.NumSeq_Trigger_1_Only page
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Wed Nov 21 2001 - 07:59:37 EST