------------------------------------------------------------ Date: Tue Nov 20 00:07:12 2001, Shift: 16:00-24:00 Supervisor: Y.K.L., with: A. M. Log book#11 pages 14 - 15 Shift Summary: ------------------------------------------------------------ 1. First beam at 21:30. Yellow beam has a short lifetime. The starting ZDC rate was 440 and steering did not help. 2. Continue with MRS @90,6B, and FS @12,2/3A. Run 5893 is a ZDC test run. HV for ZDC was lowered by 100V. 89K Tr6. Run 5895 has 120K Trigger6. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Tue Nov 20 2001 - 00:07:34 EST