Shift report 20011118 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sun Nov 18 2001 - 00:02:28 EST

  • Next message: Apache: "Shift report 20011118 00:00-08:00"

    ------------------------------------------------------------
    Date: Sun Nov 18 00:02:28 2001, Shift: 16:00-24:00
    Supervisor: James Norris, with: RW
    Log book#11 pages 4 - 6
    
    Shift Summary:
    ------------------------------------------------------------
    1. At 16:00 beam stored & cogged
       At 21:30 voted to dump
       At 21:31 preparing to dump store
       At 22:05 preparing to inject
       At 22:45 beam is stored and cogged
                                 trigger 6
    2. Run 5862 - 16:15-17:20      205K
       Run 5863 - 17:21-18:31      122K
       Run 5864 - 18:32-19:42       69K
       Run 5865 - 19:44-20:51       37K
       Run 5866 - 20:52-22:01       21K
       Run 5867 - 22:57-23:50      159K
       Run 5868 - 23:51-        running
    
    3. There was no phone call about the dump from MCR,
       and the and T3 may have tripped because DCs were  
       not parked before dump began.  Recovery was not 
       difficult, however.
    
    ------------------------------------------------------------
    