------------------------------------------------------------
Date: Fri Nov  9 16:02:57 2001, Shift: 08:00-16:00
Supervisor: TST, with: 
Log book#10 pages 118 - 119
Shift Summary:
------------------------------------------------------------
1:  Store from previous run continued to about 11.15,
with falling intensity.  Last part of store used for
beam studies - stopped data taking.  Injection attempts
around end of shift.
2:  Run   Trig1  Trig6    
    5737   380k   120k   MRS@90,4B  FFS@20,1/15B
    5738   148k    46k   MRS@90,0   FFS@20,1/10B
    5739                 DVM pedestal run
    5740                 Pedestal run
    5731                 TPC pedestal run
3:  No new detector problems.  All DC anodes still off.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Nov 09 2001 - 16:03:53 EST