------------------------------------------------------------
Date: Thu Nov  8 16:23:22 2001, Shift: 08:00-16:00
Supervisor: TST, with: 
Log book#10 pages 114 - 116
Shift Summary:
------------------------------------------------------------
1:  No beam during shift.  RHIC shut down for scheduled
maintenance.
2:  5729   Pedestal run
    5730   DVM pedestal run
    5731   TPC pedestal run
MRS moved back ~50 cm to reduce track density before
going to 25 degrees.
3:  No new detector problems.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Nov 08 2001 - 16:23:54 EST