Shift report 20011108 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Nov 08 2001 - 16:23:24 EST

  • Next message: Flemming Videbaek: "Fw: Electron Ion Collider Workshop at BNL"

    ------------------------------------------------------------
    Date: Thu Nov  8 16:23:22 2001, Shift: 08:00-16:00
    Supervisor: TST, with: 
    Log book#10 pages 114 - 116
    
    Shift Summary:
    ------------------------------------------------------------
    1:  No beam during shift.  RHIC shut down for scheduled
    maintenance.
    
    2:  5729   Pedestal run
        5730   DVM pedestal run
        5731   TPC pedestal run
    
    MRS moved back ~50 cm to reduce track density before
    going to 25 degrees.
    
    3:  No new detector problems.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Thu Nov 08 2001 - 16:23:54 EST