------------------------------------------------------------
Date: Sun Nov 4 07:54:01 2001, Shift: 00:00-08:00
Supervisor: rw, with:
Log book#10 pages 92 - 93
Shift Summary:
------------------------------------------------------------
1. Beem was on from the previous shift. At 4:00 beam was dumped.
4:15 ramping attempt failed by QLI. QLI status continued till the
of the shift.
2. run Trigger6 setting
5654 115K MRS 60deg-3B FS 12deg-1/4B
5655 82K MRS 52.5deg-3B FS 12deg-1/4B
5656 58K same as 5655
5657 TPC pedestal
5658 Pedestal
5659 DVM
3. T5 mod 2 off. No other problems.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sun Nov 04 2001 - 07:54:42 EST