Shift report 20011104 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sun Nov 04 2001 - 07:54:01 EST

  • Next message: Apache: "Shift report 20011104 08:00-16:00"

    ------------------------------------------------------------
    Date: Sun Nov  4 07:54:01 2001, Shift: 00:00-08:00
    Supervisor: rw, with: 
    Log book#10 pages 92 - 93
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beem was on from the previous shift. At 4:00 beam was dumped.
    4:15 ramping attempt failed by QLI. QLI status continued till the 
    of the shift.
    
    2.    run    Trigger6     setting
          5654    115K        MRS 60deg-3B    FS 12deg-1/4B
          5655     82K        MRS 52.5deg-3B  FS 12deg-1/4B
          5656     58K        same as 5655
          5657    TPC pedestal
          5658    Pedestal
          5659    DVM
    
    3. T5 mod 2 off. No other problems.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Sun Nov 04 2001 - 07:54:42 EST