Date: Sat Nov  3 07:49:53 2001, Shift: 00:00-08:00
Supervisor: rw, with: 
Log book#10 pages 90 - 91
Shift Summary:
------------------------------------------------------------
1.After three hours of machine study for improving the life time of Blue ring, 
a marginal storage was made at 3:00am. Blue/Yellow=15.7/15.6
ZDC rate was 350. Physics run started at 3:15. At 5:30 beam was dumped.
Soon after QLI was announced. 6:00 QLI recovered. After one ramping failed, 
the machine went into beam diagonostic study using 6 bunch beam.
2.  run     Trigger 6    
    5641      17K           FS 12deg-1/4B, MRS 60deg-3B
    5642     100K           same
    5643     TPC Pedestal run
    5644     DVM run
    5645     Pedestal run
3. For T5 mod 1 and mod 3, all three Cathods tripped off during run 5641.
------------------------------------------------------------