Date: Wed Oct 31 23:52:12 2001, Shift: 16:00-24:00
Supervisor: RW, with:
Log book#10 pages 79 - 80
Shift Summary:
------------------------------------------------------------
1. Beam came back at 17:30 and physics run started at 17:55.
Blue/Yellow=19.5/22.0 ZDC rate 350. At ZDC rate of 120, DUMP
was requested by BRAHMS and PHENIX. Beam was dumped at 20:55.
At 22:30 a very good storage was made. Blue/yellow 28.0/28.0
ZDC 1200. (STAR & PHENIX about 2000) No increase by an
additional steering request.
2. Run 5601 TPC Pedestal run
5602 DVM run
5603 Pedestals
5604 Data FS@12deg. 1/4A MRS @45deg 4A
Trigger 6 105K
5605 Trigger 6 44K, stopped by dumping beam.
5606 Trigger 6 100K start with new storage.
5607 still running.
3. T5 Mod 2 still off. No other problems are detected.
------------------------------------------------------------