------------------------------------------------------------ Date: Wed Oct 31 23:52:12 2001, Shift: 16:00-24:00 Supervisor: RW, with: Log book#10 pages 79 - 80 Shift Summary: ------------------------------------------------------------ 1. Beam came back at 17:30 and physics run started at 17:55. Blue/Yellow=19.5/22.0 ZDC rate 350. At ZDC rate of 120, DUMP was requested by BRAHMS and PHENIX. Beam was dumped at 20:55. At 22:30 a very good storage was made. Blue/yellow 28.0/28.0 ZDC 1200. (STAR & PHENIX about 2000) No increase by an additional steering request. 2. Run 5601 TPC Pedestal run 5602 DVM run 5603 Pedestals 5604 Data FS@12deg. 1/4A MRS @45deg 4A Trigger 6 105K 5605 Trigger 6 44K, stopped by dumping beam. 5606 Trigger 6 100K start with new storage. 5607 still running. 3. T5 Mod 2 still off. No other problems are detected. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Wed Oct 31 2001 - 23:52:36 EST