Date: Sun Oct 28 00:19:29 2001, Shift: 16:00-24:00
Supervisor: R.Wada, with:
Log book#10 pages 63 - 63
Shift Summary:
------------------------------------------------------------
1. After three times failures of ramping at 16.10, 17.15 and 18.15,
machine went into Ramping efficiency study mode until 22:10. At 22:30
finally they succeeded to store and cogg the beam. Data taking
started at 23:10. stopped at 00:03.
2. run 5538 TPC pedestal run(wromg run type. palser instead of pedestal.)
5539 DVM
5540 Pedestals
5541 data run FS @3deg. w 1/2A, MRS @40deg. w 3A,
same as the previous data run. triger 6 61k
3. No new problem is noticed.
------------------------------------------------------------