Shift report 20011019 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Oct 19 2001 - 16:06:01 EDT

  • Next message: Kris Hagel: "NIM Paper"

    ------------------------------------------------------------
    Date: Fri Oct 19 16:06:00 2001, Shift: 08:00-16:00
    Supervisor: JC, with: EJK
    Log book#10 pages 34 - 36
    
    Shift Summary:
    ------------------------------------------------------------
    1. Machine problems. RHIC promised a beam with 110 bunches 
    but never delivered. 'Quench interlock' and 'software 
    problems' messages all the time.
    
    2. Only one data run 5442 (15 minutes) with 
    MRS@35, 4A  FFS/BFS@4/4, 1/3B .
    
    36773 trig.5
    12335 trig.6
    
    Pedestal runs (5443-5445).
    
    3. 
    During beam taking the anode current in T3, module 3 was 
    quit high (>50microA).
    ------------------------------------------------------------
    