------------------------------------------------------------ Date: Fri Oct 19 08:05:11 2001, Shift: 00:00-08:00 Supervisor: KH, with: Log book#10 pages 32 - 34 Shift Summary: ------------------------------------------------------------ A good store from midnight to 4:45 when BRAHMS + PHENIX voted to end store. A new store started in good time, but the ramp failed. Shortly after that, the monitor said: "Power Supply Control problem. An expert is investigating." At the end of the shift, there is a Cryogenic System problem. Runs achieved: run trig1 trig 6 5435 401662 128359 5436 ----- 30000 estimated 5438 122137 38803 Run 5436 ran for 45 minutes, then crashed with an IoServer error. It took one false start, but I got it going again by stopping IoServer, restarting RunServer and then starting IoServer again. Because of that, the trigger entries were not logged into the rundb. The end of run 5438 brings the total trig 6 triggers to 387958. After the store was over, I therefore had MCR come and change the polarities. So the polarities of the FS magnets are now set on B and the polarity of D5 is now A. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Oct 19 2001 - 14:06:00 EDT