------------------------------------------------------------
Date: Sun Oct  7 08:00:05 2001, Shift: 00:00-08:00
Supervisor: JH Lee, with: 
Log book#9 pages 107 - 110
Shift Summary:
------------------------------------------------------------
Beam:
  - Two stores for the shift (0:10-4:20,5:10-7:40)
  - 50 min between stores
  - with low ZDC rates (< 300/sec) 
Data: 
   Runs 5201 - 5209
   MRS 
    - 35deg 4A (2M) and 0-field (0.5M): Done
    - Now at 45deg 4A: 300K/2M 
   FS
    - 12deg/3deg D1,D2 at 1/5B (2M) and 
      0-field (D1=1/3B,D2,D3,D4=0) (0.5M): Done
    - Now D1,D2 at 1/5A: 300K/1M
 
No new detector problems
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sun Oct 07 2001 - 08:00:44 EDT