------------------------------------------------------------ Date: Tue Oct 2 15:48:17 2001, Shift: 08:00-16:00 Supervisor: Eun-Joo Kim, with: Log book#9 pages 75 - 76 Shift Summary: ------------------------------------------------------------ 1. No beam : quench interlock, power dip etc "preparing to refill" message at 15:00 2. No Achievements : pedestal, DVM run 3. No detector problems. FV installed modified trigger/clock module. Inspected TPC pedestal run (run 5092), and nothing new from before. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Tue Oct 02 2001 - 15:48:46 EDT