------------------------------------------------------------ Date: Thu Sep 13 16:23:20 2001, Shift: 08:00-16:00 Supervisor: EJ, with: DS Log book#8 pages 123 - 123 Shift Summary: ------------------------------------------------------------ 1. At 16.00 beam stored and cogged with only 6 bunches. 2. Run 4716 begun. ZDC rate is only 3.3. 3. No detector problems. On previous run 4713 there was no signal in H1 bot ch. 33, but now we see signal in this chan. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Sep 13 2001 - 16:24:02 EDT