Shift report 20010908 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Sep 08 2001 - 15:45:34 EDT

  • Next message: Apache: "Shift report 20010908 16:00-24:00"

    ------------------------------------------------------------
    Date: Sat Sep  8 15:45:34 2001, Shift: 08:00-16:00
    Supervisor: ZM, with: -
    Log book#8 pages 95 - 96
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam was lost at 8:20 and no beam up to end of shift.
    
    2. Controled access to IR (12:15 to 13:15)
       Checking of the T3 cabling. First run after
       re-instalation of T3 shows some bad connections.
    3. No other detector problems 
    ------------------------------------------------------------
    