Shift report 20010903 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Mon Sep 03 2001 - 08:10:40 EDT

  • Next message: Apache: "Shift report 20010903 08:00-16:00"

    ------------------------------------------------------------
    Date: Mon Sep  3 08:10:39 2001, Shift: 00:00-08:00
    Supervisor: K. Hagel, with: 
    Log book#8 pages 67 - 69
    
    Shift Summary:
    ------------------------------------------------------------
    RHIC achieved stored and cogged beam at 5:20.
    No beam before that
    Run 4565: short run
    Run 4566: 145579 events; 86964 trig1, 22983 trig3; 134003 trig4
    Run 4567: 30121 events;  17357 trig1,  4646 trig3;  26946 trig4
    
    Beam dumped again because of Quench Link Interlock
    
    No noticable detector problems
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Mon Sep 03 2001 - 08:11:29 EDT