Shift report 20010831 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Aug 31 2001 - 08:10:01 EDT

  • Next message: Hironori Ito: "Shift Check List"

    ------------------------------------------------------------
    Date: Fri Aug 31 08:10:01 2001, Shift: 00:00-08:00
    Supervisor: EJ, with: 
    Log book#8 pages 46 - 46
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam with low collision rate ended at 3.00. Beam again
       at 7.00.
    2. Run 4508 (and 4518, 4520, 4521 without FB3). 
    3. Unable to start runs with FB3 (Drift Chambers). Problems
       with IoServer connection. Solved by restarting it.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Fri Aug 31 2001 - 08:10:39 EDT