Shift report 20010830 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Aug 30 2001 - 16:36:13 EDT

  • Next message: Apache: "Shift report 20010830 16:00-24:00"

    ------------------------------------------------------------
    Date: Thu Aug 30 16:36:12 2001, Shift: 08:00-16:00
    Supervisor: Alexandru JIPA, with: -
    Log book#8 pages 43 - 44
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam up to 8.30. Also, between 11.45 and 12.02, 12.30 and 13.15.
    Since 15.25 we have beams, again.
    2. Runs 4501, 4502 (a few events, only 2 minutes long), 4503, and 4504.
    3. T3 off. No other detector problems.
    Some problems at the using ".L SummaryPlots.C". On pii4 and pii5 the
    same answer: "Error in <TPrint::Process...>".
      
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Thu Aug 30 2001 - 16:36:48 EDT