The work done on T3 II involved the disconnection of HV to anodes in the V prime plane not all V planes as stated in the shift report. Tha puts ge detector in better shape tham Mr Tools. The reference to T2 in the same report must be a typo it should T3 II anodes. Ramiro
This archive was generated by hypermail 2b30 : Fri Aug 24 2001 - 04:40:20 EDT