Re: Shift report 20010823 16:00-24:00

From: Ramiro Debbe (debbe@sgs1.hirg.bnl.goV)
Date: Fri Aug 24 2001 - 04:35:43 EDT

  • Next message: Djamel Ouerdane: "C1 Pid"

    The work done on T3 II involved the disconnection of HV to anodes in the V
    prime plane not all V planes as stated in the shift report. Tha puts ge
    detector in better shape tham Mr Tools. The reference to T2 in the same
    report must be a typo it should T3 II anodes.
    
    Ramiro
    