------------------------------------------------------------
Date: Tue Aug 21 16:00:09 2001, Shift: 08:00-16:00
Supervisor: Eun-Joo Kim, with: JIJ,FV, Betty
Log book#7 pages 147 - 148
Shift Summary:
------------------------------------------------------------
1. No beam at all. Newwork problem etc.
2. No achievements : pedestal Run : 4316
TPC pedestal Run : 4329
3. Opus, pii5 reboot -> Lost DAQ Control.
FV fixed DAQ-control : Now Back!
-> reset HV, camac etc for TOFW, TPM1, sbe6...
Power supply for FFS1440 was recycled.
-> High Voltage for H1, C1 was back.
------------------------------------------------------------
This archive was generated by hypermail 2b30 : Tue Aug 21 2001 - 16:00:52 EDT