Shift report 20010821 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Tue Aug 21 2001 - 16:00:09 EDT

  • Next message: Apache: "Shift report 20010822 16:00-24:00"

    ------------------------------------------------------------
    Date: Tue Aug 21 16:00:09 2001, Shift: 08:00-16:00
    Supervisor: Eun-Joo Kim, with: JIJ,FV, Betty
    Log book#7 pages 147 - 148
    
    Shift Summary:
    ------------------------------------------------------------
    1. No beam at all. Newwork problem etc.
    
    2. No achievements : pedestal Run : 4316
                         TPC pedestal Run : 4329    
    
    3. Opus, pii5 reboot -> Lost DAQ Control.
      
       FV fixed DAQ-control : Now Back!
        -> reset HV, camac etc for TOFW, TPM1, sbe6...
    
       Power supply for FFS1440 was recycled.
        -> High Voltage for H1, C1 was back.
       
       
                                
               
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Tue Aug 21 2001 - 16:00:52 EDT