------------------------------------------------------------ Date: Sat Aug 18 08:09:15 2001, Shift: 00:00-08:00 Supervisor: sjs, with: am Log book#7 pages 120 - 120 Shift Summary: ------------------------------------------------------------ Ran (with low beam intensity) until 3:08, then blue quench. At 4:45 "Cryogenic lead flow alarm" As 6:30 received call from MCR: "Expert called in--it will be a while." Run 4265 had 118K trigger 1 events. At suggestion of FV, attempted to put 100 V on T3 anode 2-- does not hold, suggests broken wire. Darn. Rewraped si5_3 detector, ready to be reinserted with access allowed. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Sat Aug 18 2001 - 08:09:46 EDT