------------------------------------------------------------ Date: Fri Aug 17 07:57:25 2001, Shift: 00:00-08:00 Supervisor: Alexandru JIPA, with: Andrei MAKEEV Log book#7 pages 107 - 109 Shift Summary: ------------------------------------------------------------ 1. Beams up to 1.00 am. Run 4246 stopped. At 3.00 am the beams were cogged and stored. Run 4251 up to 6.50 am (new problems with the beams). 2. Two data runs: 4246 (since 20.37) and 4251 (3.14 am - 6.50 am). Other runs for ZDCs modifications tests. For the second experimental data run some problems at the HPSS (solved around 7.00 am). 3. No problems with detectors. Some problems with the two cameras during the check (images suddenly lost and camera is blocked). AM made some works for ZDCs. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Fri Aug 17 2001 - 07:58:03 EDT