Shift report 20010816 08:00-16:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Thu Aug 16 2001 - 15:53:28 EDT

  • Next message: Apache: "Shift report 20010817 16:00-24:00"

    ------------------------------------------------------------
    Date: Thu Aug 16 15:53:27 2001, Shift: 08:00-16:00
    Supervisor: Eun-Joo Kim, with: 
    Log book#7 pages 101 - 101
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam for a hour from 10:13-10:56, 
       but "blue quench link interlock"
       
       Beam was preparing to ramp  56 bunches, 
       and cogging in process. (15:20)
    
       No beam at 15:51.
    
    2. Run #4229 TPC Pedestal
       Run #4230 Pedestal
       Run #4231 Data Run very very low rates
    
    3. Bob changed NIM Power Supply on bottom NIM CRATE, 
       Rack #3 in FEH around 11:30am
    
       No Detector problems observed.
      
    ------------------------------------------------------------
    