------------------------------------------------------------ Date: Thu Aug 16 15:53:27 2001, Shift: 08:00-16:00 Supervisor: Eun-Joo Kim, with: Log book#7 pages 101 - 101 Shift Summary: ------------------------------------------------------------ 1. Beam for a hour from 10:13-10:56, but "blue quench link interlock" Beam was preparing to ramp 56 bunches, and cogging in process. (15:20) No beam at 15:51. 2. Run #4229 TPC Pedestal Run #4230 Pedestal Run #4231 Data Run very very low rates 3. Bob changed NIM Power Supply on bottom NIM CRATE, Rack #3 in FEH around 11:30am No Detector problems observed. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Aug 16 2001 - 15:54:25 EDT