------------------------------------------------------------ Date: Wed Aug 15 01:18:39 2001, Shift: 16:00-24:00 Supervisor: sjs, with: sjs,ah,hi Log book#7 pages 89 - 89 Shift Summary: ------------------------------------------------------------ No beam for most of shift due to DX power supply problem. Cogged beam achieved late in shift. Set low-gain ZDC pedestal locations to ch 10-30. Also attempted to set high-gain ZDC pedestals, but unable to locate setting that placed these within adc range. Checked Q-L suppression feature on ADC (which is enabled), but changing this setting did not seem to have a noticable effect. Decided this exercise better done without beam. No new detector problems found. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Wed Aug 15 2001 - 01:19:43 EDT