Shift report 20010811 00:00-08:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Sat Aug 11 2001 - 03:37:04 EDT

  • Next message: Apache: "Shift report 20010811 08:00-16:00"

    ------------------------------------------------------------
    Date: Sat Aug 11 03:37:04 2001, Shift: 00:00-08:00
    Supervisor: Michael Murray, with: Mades
    Log book#7 pages 58 - 60
    
    Shift Summary:
    ------------------------------------------------------------
    No beam at start, then MCR visited us and said no beam
    until the late morning.
    Ramerio called and asked us to measure the drift velocity.
    We started a DVM pulser run , #4114,
     to measure the drift velocities. These are recorded in
    the log book. As Ramero wanted high statistics we
    left this run going. It can be stopped by day-shift.
    MCR will send some one to fix magnets.
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Sat Aug 11 2001 - 03:37:54 EDT