Shift report 20010810 16:00-24:00

From: Apache (apache@pii3.brahms.bnl.gov)
Date: Fri Aug 10 2001 - 00:03:03 EDT

  • Next message: Apache: "Shift report 20010810 00:00-08:00"

    ------------------------------------------------------------
    Date: Fri Aug 10 00:03:02 2001, Shift: 16:00-24:00
    Supervisor: CR, with: AH
    Log book#7 pages 54 - 55
    
    Shift Summary:
    ------------------------------------------------------------
    1. No beam for the entire shift.
    2. No run, no achivements.
    3. No problems with the detectors.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b30 : Fri Aug 10 2001 - 00:03:57 EDT