------------------------------------------------------------ Date: Thu Aug 9 07:57:42 2001, Shift: 00:00-08:00 Supervisor: JIJ, with: RK Log book#7 pages 50 - 51 Shift Summary: ------------------------------------------------------------ 1. Heat problem in A10 and RF problem. Some low intensity storage, but single rate was < 1/s. 2. No data taken. 3. D2 and D5 had at "stand-by" fault at some point. This was cleared by cycling to stand-by mode in the magnet control program. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Thu Aug 09 2001 - 07:58:22 EDT