------------------------------------------------------------ Date: Wed Aug 1 23:52:50 2001, Shift: 16:00-24:00 Supervisor: P. C., with: K. H. Log book#6 pages 143 - 146 Shift Summary: ------------------------------------------------------------ No beam during entire shift. Machine status: First part was the end of scheduled maintenance. During the rest of the time, Status was machine development. At the moment, Gold is in AGS, RHIC is swept and preparations for beam operation continue. Experimental status: FFS was moved to 6 deg Current positions: FFS 6 deg BFS 6 deg MRS 90 deg All magnets turned on to 1/5 max field D1 676 (2.5 kG) pol A D2 555 (3.4 kG) pol A D3 588 (2.4 kG) pol A D4 534 (2.4 kG) pol A D5 352 (2.1 kG) pol A (1/7 max field) These are the conditions to start Second Goal step 1 For First Goal step 3, we have about 333k events, but it should be noted that T1 was not working during the whole time and that part might well have to be done over. ------------------------------------------------------------
This archive was generated by hypermail 2b30 : Wed Aug 01 2001 - 23:53:35 EDT