Shift report 20000905 16:00-24:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Tue Sep 05 2000 - 00:05:34 EDT

  • Next message: http account: "Shift report 20000905 00:00-08:00"

    ------------------------------------------------------------
    Date: Tue Sep  5 00:05:33 2000, Shift: 16:00-24:00
    Supervisor: JHL, with: AJ
    Log book#5 pages 97 - 99
    
    Shift Summary:
    ------------------------------------------------------------
    1. Beam
       Machine has been down since 18:00 due to
       "AGS MMPS Ground Fault".  ~2 hours beam 
       before the problem.
    
    2. Data
       - Run 2535 (MRS and FS: A-pol) has ~150K collisions.
       - Run 2536 (MRS: 0 field, FS: A-pol) has ~100K collisions.
       - Run 2529 (MRS and FS: A-pol, D2=0) has ~20K collisions.
    
    3. Detector
       Normal Detector performance.
    
    4. Current Setting
       MRS@90 FS@4
       D1,D3,D4=A-pol 
       D2=0 
       D5=A-pol
    
    5. Run Plan when beam is back (hopefully) 
       - 80K events with current setting
       - 100K with D1=0 and D2,D3,D4,D5: A-pol
       - D1-D5 all A-pol: for the rest of the beam time
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b29 : Tue Sep 05 2000 - 00:06:08 EDT