------------------------------------------------------------ Date: Tue Sep 5 00:05:33 2000, Shift: 16:00-24:00 Supervisor: JHL, with: AJ Log book#5 pages 97 - 99 Shift Summary: ------------------------------------------------------------ 1. Beam Machine has been down since 18:00 due to "AGS MMPS Ground Fault". ~2 hours beam before the problem. 2. Data - Run 2535 (MRS and FS: A-pol) has ~150K collisions. - Run 2536 (MRS: 0 field, FS: A-pol) has ~100K collisions. - Run 2529 (MRS and FS: A-pol, D2=0) has ~20K collisions. 3. Detector Normal Detector performance. 4. Current Setting MRS@90 FS@4 D1,D3,D4=A-pol D2=0 D5=A-pol 5. Run Plan when beam is back (hopefully) - 80K events with current setting - 100K with D1=0 and D2,D3,D4,D5: A-pol - D1-D5 all A-pol: for the rest of the beam time ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Tue Sep 05 2000 - 00:06:08 EDT