------------------------------------------------------------ Date: Fri Sep 1 16:01:35 2000, Shift: 08:00-16:00 Supervisor: ZM, with: EJ Log book#5 pages 71 - 74 Shift Summary: ------------------------------------------------------------ 1. Continous beam until 11:34 - parasitic studies, 13:30 - ring access. At 15:00 power outage in 1000P. 16:00 recent info - transformer problem. 2. Run#2494 collected 234K trig.#1 Run#2495 collected 166K trig.#1 YB&KH set BBdicr. at 100mV (all small tubes and big R31) other big tubes - 150 mV, Expert says that BFS platform canot moved. RD check the magnets poles: D5 points North whe polarity is set to A, D2 points South when polarity is set B. Connection of D5 to the Keithley readout was fixed. 3. No detector problems. ------------------------------------------------------------