------------------------------------------------------------ Date: Sat Aug 26 07:40:40 2000, Shift: 00:00-08:00 Supervisor: ZM, with: RO Log book#5 pages 18 - 19 Shift Summary: ------------------------------------------------------------ 1. Beam stored and cogged at 1:35. Smooth runing up to 6:15 when beam has been dumped. Beam intesity lower than during former shifts: triger # 1 = (10 - 20)/sec. 2. Two runs recorded (#2443 with 341877 events #2444 with 172009 events). MRD at 45 deg., D5(700A, polarity A) FS at 5 deg., D1(625A, polarity B) D2(492A, polarity B) 3. No problems ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Sat Aug 26 2000 - 07:44:03 EDT