------------------------------------------------------------ Date: Fri Aug 25 08:22:13 2000, Shift: 00:00-08:00 Supervisor: ykl, with: B2 Log book#5 pages 13 - 15 Shift Summary: ------------------------------------------------------------ 1. Continuous beam interruped once at midnight for an hour for beam dumping. Ion intensity exceeded 1.7 x E^10 for both beams. 2. Run 2435 with D1 625/B at 8 degrees, D2 492/B at 5 degrees, D5 350/A at 90 degrees, has 991K Trigger 1. MRS platform was moved to 45 degrees and Run 2436 was started, with the same settings for the magnet. 3. T1 worked without tripping with the field at 7700 and anode at 1600. Turning the MRS platform met resistence at 63 degrees. No new equipment problem. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Fri Aug 25 2000 - 08:25:26 EDT