Shift report 20000825 00:00-08:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Fri Aug 25 2000 - 08:22:13 EDT

  • Next message: http account: "Shift report 20000825 08:00-16:00"

    ------------------------------------------------------------
    Date: Fri Aug 25 08:22:13 2000, Shift: 00:00-08:00
    Supervisor: ykl, with: B2
    Log book#5 pages 13 - 15
    
    Shift Summary:
    ------------------------------------------------------------
    1. Continuous beam interruped once at midnight for an hour
    for beam dumping. Ion intensity exceeded 1.7 x E^10 for
    both beams.
    2. Run 2435 with D1 625/B at 8 degrees, D2 492/B at
    5 degrees, D5 350/A at 90 degrees, has 991K Trigger 1.
    MRS platform was moved to 45 degrees and Run 2436 was
    started, with the same settings for the magnet.
    
    3. T1 worked without tripping with the field at 7700 and
    anode at 1600. Turning the MRS platform met resistence
    at 63 degrees. No new equipment problem.
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b29 : Fri Aug 25 2000 - 08:25:26 EDT