------------------------------------------------------------ Date: Thu Aug 24 08:23:09 2000, Shift: 00:00-08:00 Supervisor: ykl, with: b2 Log book#5 pages 4 - 6 Shift Summary: ------------------------------------------------------------ 1.Continuous beam was available except for an hour and half for a beam dump at 3:54. 2. Run 2422 continuing from the previous shift gave 574K of Trigger 1 which accomplished 800K of Trigger 1 with D5 polarity A. So the D5 polarity is changed to B and the run 2423 was started with 350A for D5. 3. The anode and field of T1 tripped frequently (within a few minutes) even after the field HV was raised to 450. The server tsir crashed. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Thu Aug 24 2000 - 08:26:23 EDT