    Shift Summary:
    ------------------------------------------------------------
    1. Beam was lost due to link quench problem at 1:32.
    The newly stored beam lasted from 5:04 till 7:17. An
    increased background is suspected because the rate of 
    trigger 1 is almost equivalent to the rate of trigger 4.
    2. The run 2403, continued from the previous shift gave
    516K of Trigger 1 with D5 at 350A with polarity A. Run 2406
    gave 301K with D5 at 350A with polarity B.
    3. T1 and T3 are not turned on. No new detector problems.
    ------------------------------------------------------------
    