------------------------------------------------------------
Date: Sun Aug 20 23:34:49 2000, Shift: 16:00-24:00
Supervisor: EJK, with: Ronny
Log book#4 pages 132 - 133
Shift Summary:
------------------------------------------------------------
1. "Beam will be dumped at 18:55".
Since then, "RHIC Quench Link Interlock".
2. Run 2366-2367 : 48k trigger 1 for each run.
Same condition with Run 2358.
3. No additional detector problems.
------------------------------------------------------------
This archive was generated by hypermail 2b29 : Sun Aug 20 2000 - 23:37:57 EDT