Shift report 20000811 16:00-24:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Fri Aug 11 2000 - 00:06:12 EDT

  • Next message: http account: "Shift report 20000811 00:00-08:00"

    ------------------------------------------------------------
    Date: Fri Aug 11 00:06:11 2000, Shift: 16:00-24:00
    Supervisor: FR, with: JN,CE
    Log book#4 pages 46 - 47
    
    Shift Summary:
    ------------------------------------------------------------
    
    - No beam during entire shift.
     At 20:00, RHIC had a Power Supply failure (blue trim quad).
     Power supply  fixed at 22:10. Current  status "Working on 
     injection". 
     
    - No data taken.
    
    - Unable to turn on D1,D2 and D3 magnets. Called the "watch"
      to fix the problem.
      D1 and D2 are at 1/6 of max. field. D5 is at 1/4 of max.
      field.
      MCR swapped ch#13 and ch#1 (ZDC scalers), see log book p.47.
      RHIC Video system not working since 22:00.
      No detector problems.
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b29 : Fri Aug 11 2000 - 00:09:38 EDT