------------------------------------------------------------ Date: Fri Aug 11 00:06:11 2000, Shift: 16:00-24:00 Supervisor: FR, with: JN,CE Log book#4 pages 46 - 47 Shift Summary: ------------------------------------------------------------ - No beam during entire shift. At 20:00, RHIC had a Power Supply failure (blue trim quad). Power supply fixed at 22:10. Current status "Working on injection". - No data taken. - Unable to turn on D1,D2 and D3 magnets. Called the "watch" to fix the problem. D1 and D2 are at 1/6 of max. field. D5 is at 1/4 of max. field. MCR swapped ch#13 and ch#1 (ZDC scalers), see log book p.47. RHIC Video system not working since 22:00. No detector problems. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Fri Aug 11 2000 - 00:09:38 EDT